Your browser does not support script
Location Map
Copperstone
Overview
General
Location
Title
Geology
Mining History
Past Work Programs
Current Work Programs
Future Work Programs
Feasibility Study
Important Info
Video Gallery
Photo Gallery
Map Gallery
Technical Reports
Reserves and Resources
Gold Bar
Belmont
Oatman
Exploration Technology
Photo Gallery
Previous.
All pages
. Next.
1
.
2
.
3
.
4
in
3
1
2
3
4
5
6
7
8
9
10
columns
DZone High Grade Core
Gold in Core from Underground Drilling
High Grade Rock +5 oz per ton
Copper Oxide Vein
Pit Wall to North
Open Pit to the West
Foot Wall Target Drill Site
Looking North to Portal at bottom of open pit
Surface Drill Program Underway
Surface Drill Program Underway #2
Surface Drill Program Underway #3
Footwall Exploration Target Drilling
Base of Pit and D-Zone Portal
From Portal looking South
Copperstone Fault In Pit - Runs Plus 1/2 oz
Tunnel to D Zone
Underground Mining Jumbo
Mining in the Decline
Jackleg at rest in DZone
Face Wired for Blast
Drills Arrive on Site
DZone - Bolting Underground Core Drill in Place
DZone Underground Drilling Rig
Joe Processing Underground Core
CEO Inspects High Grade
High Grade (multi-ounce per ton) Core from D Zone Drilling
Mineralized D Zone Core
DZone Underground Core Box
Underground Panel Sample Site
Electricians at Work Underground
Electrical work underground - Kenny
Mining Contractor in Copper Zone
Underground Transformer
Underground electrical substation
Underground electrical switchbox
Underground Survey setup
Facilities and Shops
Dumps and Facilities
Facilites with the Dry and Previous Lab
Power Substation
Water Storage Tank
Maintenance Shop
Entry off Highway 95
Miners in the Shop after Shift
Drill Core Logging Bench
Previous.
All pages
. Next.
1
.
2
.
3
.
4
in
3
1
2
3
4
5
6
7
8
9
10
columns
©2006 American Bonanza Gold Corporation All Rights Reserved. |
Disclaimer