DZone High Grade Core |
Gold in Core from Underground Drilling |
High Grade Rock +5 oz per ton |
Copper Oxide Vein |
Pit Wall to North |
Open Pit to the West |
Foot Wall Target Drill Site |
Looking North to Portal at bottom of open pit |
Surface Drill Program Underway |
Surface Drill Program Underway #2 |
Surface Drill Program Underway #3 |
Footwall Exploration Target Drilling |
Base of Pit and D-Zone Portal |
From Portal looking South |
Copperstone Fault In Pit - Runs Plus 1/2 oz |
Tunnel to D Zone |
Underground Mining Jumbo |
Mining in the Decline |
Jackleg at rest in DZone |
Face Wired for Blast |
Drills Arrive on Site |
DZone - Bolting Underground Core Drill in Place |
DZone Underground Drilling Rig |
Joe Processing Underground Core |
CEO Inspects High Grade |
High Grade (multi-ounce per ton) Core from D Zone Drilling |
Mineralized D Zone Core |
DZone Underground Core Box |
Underground Panel Sample Site |
Electricians at Work Underground |
Electrical work underground - Kenny |
Mining Contractor in Copper Zone |
Underground Transformer |
Underground electrical substation |
Underground electrical switchbox |
Underground Survey setup |
Facilities and Shops |
Dumps and Facilities |
Facilites with the Dry and Previous Lab |
Power Substation |
Water Storage Tank |
Maintenance Shop |
Entry off Highway 95 |
Miners in the Shop after Shift |
Drill Core Logging Bench |
|
|
|