

|  | 

Proposed Program
The results to date justify a significant staged program of geophysical surveying and drilling to further evaluate the gold system at Martiniere. The recommended program includes 10 line-kilometres of IP-resistivity survey and 2000 metres of diamond drilling. The total cost of this program is estimated to be CDN$200,000.
|  |